• BIST 1.034
  • Altın 480,347
  • Dolar 7,2420
  • Euro 8,5968
  • İstanbul 24 °C
  • Ankara 19 °C

Jiaxing LNG terminal starts construction

Jiaxing LNG terminal starts construction
Jiaxing LNG storage and transportation terminal project in Zhejiang province started construction at Dushan port area.

It will comprise two newly built LNG berths including one 30,000 tonnes-class berth and one 5,000 tonnes-class berth an annual design capacity of 1m tons and 150,000 tons respectively.

The project is expected to be completed in ten months.

In Sep 2019, Jiaxing Gas Group and Zhejiang Seaport Group signed a cooperation agreement to jointly develop Jiaxing LNG terminal project, which will greatly improve LNG supply capacity in Zhejiang and Yangtze river delta upon delivery.

 

TURKISH MARITIME NEWS

 
This news is a total 1640 time has been read
  • Comments 0
    UYARI: Küfür, hakaret, rencide edici cümleler veya imalar, inançlara saldırı içeren, imla kuralları ile yazılmamış,
    Türkçe karakter kullanılmayan ve büyük harflerle yazılmış yorumlar onaylanmamaktadır.
    Bu habere henüz yorum eklenmemiştir.
Other News
All Rights Reserved © 2006 TURKISH MARITIME | İzinsiz ve kaynak gösterilmeden yayınlanamaz.
Phone : 0090 212 293 75 48 | Fax : 0090 212 293 75 49 |