The project broadly covers:
1. Design and construction of approx. 1,500m deep-sea quay (retaining height approx. 25m – 30m);
2. Design and construction of approx. 750m inland quay (retaining height about 11m – 12m);
3. Design and construction of a harbour basin of approx. 5 million m3 of dredging.
These works are to be carried out at 2 locations, namely: de Kop van de Beer, hoek de Beerkanaal and Calandkanaal in the Europoort (deep water berths, dredging harbour basin) and the Dintelhaven (inland moorings).
The deadline for this tender is June 5, 2012.