CCCC Second Harbor Inks
01 Ağustos 2012 Çarşamba 12:26
On July 17, CCCC Second Harbor Consultants Co., Ltd. signed the contract for survey and design of Phase 1 initial works of No. 3 operation zone of Yangluo area, Wuhan New Port, with a contract value of 33.75 million yuan.

Located in the core container transport area of Wuhan New Port, with a coastline of 563 meters and an area of 1,500 mu, the project involves four 5000t container berths. After project completion, the annual through capacity will come to 700,000 TEUs.

The project plays a positive role in perfecting the transportation system of Wuhan New Port and sharpening its core competitiveness.

 

http://www.turkishmaritime.com.tr/

source: dredgingtoday

Jose Maura Barandiaran
Metin Kalkavan*
Capt. Tuncay Çehreli*
REPORTS
SPECIAL NEWS
ANALYSIS
VIDEO GALLERY